References
Our References from the Past 21 Years
of MAKS-D, s.r.o. Operations
Energy Sector
- U. S. Steel Košice, s.r.o.
Reconstruction of Wind Heater No. 23 at VP2 (2023–2024)
Engineering, delivery, dismantling, installation, supervision, SAT tests, commissioning assistance, operator training - Liberty Ostrava a.s.
Repair of Primary Coke Gas Cooler 1B at Plant 10 (2023)
Complete replacement of the pipe cooling section - SIGMA DIZ spol. s r.o.
Wastewater Quality – Reduction of Dissolved Substances – Heating Plant Section (2023–2024)
Delivery and installation of pipe routes DPS 01.03, delivery and installation of the technological part of neutralization tanks - TERMOSTAV-MRÁZ, spol. s r.o., Košice
Reconstruction of WH No.14 at VP1 (2021)
Reconstruction and upgrade of wind heater - UNISTAV Prievidza a.s.
Apparatus Production (2021)
Manufacturing of technology for oil transesterification - VOLINIA, a.s.
Boiler Plant Relocation in Senica (2020)
Dismantling of existing boiler plant technology including internal steel structures and chimneys. Installation including NDT and individual testing. - Duslo, a.s.
MTL Modernization – Boiler Room Šaľa (2017)
Delivery and installation of complete technology including pipe systems and steel structures - E.D.T. s r.o.
Delivery and installation of cooling circuit, Hall No. 3 (2017)
Complete delivery and installation of pipe systems and steel structures - CHEMSTROJ, s.r.o.
Delivery and installation of piping systems (2017)
Complete delivery and installation of piping and steel structures - Lovochemie, a.s.
Pipe Bridges (2016)
Complete delivery and installation of piping systems and steel structures - U. S. Steel Košice, s.r.o.
Increase of Nitrogen Volume and Pressure at PZL2 (2015)
Complete delivery and installation of piping systems and steel structures - Hydrotech, a.s.
Manufacturing and installation of IC and MIX tank (2015)
Delivery of pressure vessels - Energyco, s.r.o.
Production and Delivery of OVT (2015)
Delivery and production of TG equipment - Tepláreň Košice, a.s.
Pressure Unit of Combustion Chamber PK4s (2014)
Delivery and installation of complete technology including piping and steel structures - U. S. Steel Košice, s.r.o.
Steam Piping to PK3 Turbine (2010)
Delivery and installation of DN250, DN300 piping - Mondi SCP, a.s.
Heat Recovery from Flue Gas Boiler (2010)
Complete delivery and installation of piping systems - Mondi SCP, a.s.
Turbine Connection and RK1 RK2 (2010)
Complete delivery and installation of piping systems - U. S. Steel Košice, s.r.o.
Relocation of Energy Distribution (2010)
Delivery and installation of DN 65, DN 250 piping - BUKOCEL, a.s.
TK4 Steam Turbine Circuit (2008)
Complete delivery and installation of piping systems and steel structures - TEKO, a.s. + SARMAT LT, s.r.o.
General Overhaul of Steam Pipeline (2008)
Replacement of DN250 welded fittings - Hydrotech, a.s.
Thermal Power Plant in Malešice (2008)
Installation of storage tank including delivery and prefabrication - U. S. Steel Košice, s.r.o.
Replacement of Oxygen Automatic Valves (2008)
Delivery and installation of complete technology including piping and steel structures - Slovnaft, a.s. + Linde Gas k.s.
Polypropylene Line (2006)
Complete delivery and installation of piping systems – live steam piping 530°C / 1.15 MPa - U. S. Steel Košice, s.r.o.
General Overhaul of Converter K1, K3 (2005)
Complete delivery and installation of piping systems – live steam piping
Chemical Industry
- Duslo a.s.
General delivery of KD3 Tertiary Reduction installations (2023 - 2024)
Implementation project, material supplies, installations in all professions, comprehensive functional and official tests - Lovochemie, a.s.
Revamp LV - modifications related to the replacement of the separator and crusher (2022)
Supply and installation of steel structures, dismantling of technology, installation of technology, piping systems, modifications - Mondi SCP, a.s.
White liquor tank and accessories (2021)
Manufacturing of a liquor tank required for paper production - Duslo a.s.
2373/O NOx gas heat recovery for condensate heating in KD2 production (2021)
Technology for waste heat utilization - DUSLO, a.s.
IA 6143 Company heating system renewal - RCHS reconstruction (2021)
Reconstruction of steam and hot water heating systems in the Energy section, thermal operations - Flow Pumps, a.s.
Tank production (VOLINIA, a.s.) (2020)
Production, delivery and installation of 6 tanks - DUSLO, a.s.
IA2335/R DASA H production (2020)
Extension of UGL with a new lignite grinding stage with lignite storage and pipelines on a new pipe-energy bridge, construction, mechanical, electrical, instrumentation and control - DUSLO, a.s.
IA 1273/O Sulfenax intensification to 11kton, section PS 06 Oxidation - stage 2 (2020)
Supply and installation of column tank, absorption column, heat exchanger, circulation pump, pipelines, steel structures and lighting - DUSLO, a.s.
IA 1273/O Sulfenax intensification to 11kton, section PS 05 Claus unit efficiency increase (2020)
Supply and installation of column tank, absorption column, heat exchanger, circulation pump, pipelines, steel structures and lighting - DUSLO, a.s.
IA 2308c/R KD3 operation intensification, Absorption cooling section (2020)
Complete supply and installation of piping systems - Mondi SCP, a.s.
STEP2 (D&S, BSW and MC Ozone stage) - Piping routes (2019)
Complete supply and installation of piping systems - Mondi Štětí, a.s.
Bleaching plant upgrade / Piping and mechanical erection Phase B (2018)
Supply and installation of complete technology including piping systems and steel structures - Mondi SCP, a.s.
Equipment delivery (2018)
Supply of technological equipment - Mondi SCP, a.s.
ECO+ piping (2018)
Complete supply and installation of piping systems - CASALE PROJECT, a.s.
KD6 nitric acid plant intensification (2017)
Supply and installation of complete technology including piping systems and steel structures - K-PROTOS, a.s.
PVC production after electrolysis shutdown - SPOLANA - Neratovice (2017)
Supply and installation of complete technology including piping systems and steel structures - Mondi SCP, a.s.
Black liquor tank (2017)
Supply and installation of storage tank including accessories - DUSLO, a.s.
New DAM tank (2017)
Complete supply and installation of storage tanks (V = 3000 m3), piping systems and steel structures - KLEMENT, a.s.
Delivery, production and installation of storage tanks - Diamo (2017)
Complete supply and installation of storage tanks, piping systems and steel structures - KLEMENT, a.s.
Pipe installation (2017)
Complete supply and installation of piping systems and steel structures - DUSLO, a.s.
Urea dust filtration from MČ cooling unit (2017)
Supply and installation of complete technology including piping systems and steel structures - DUSLO, a.s.
New DAM tank - 1303 (2017)
Complete supply and installation of storage tanks (V = 3000 m3), piping systems and steel structures - DUSLO, a.s.
Dosing of inhibitors for ENSIN production (2017)
Supply and installation of complete technology including piping systems and steel structures - Mondi SCP, a.s.
Storage tank (White liquor tank and piping) (2017)
Supply and installation of storage tank including accessories - Mondi Štětí, a.s.
Piping bridges (2017)
Supply and installation of complete technology including piping systems and steel structures - Mondi Štětí, a.s.
EcoFlex-BoTH material & erection (2017)
Supply and installation of complete technology including piping systems and steel structures - DUSLO, a.s.
Overhaul of above-ground piping systems (2016)
Dismantling, supply and installation of piping systems and pipe bridges - DUSLO, a.s.
Overhaul of ammonia storage equipment (2016)
Complete supply and installation of TG equipment - DUSLO, a.s.
ČP 4, Power supply and overhaul of above-ground piping (2016)
Supply and installation of complete technology including piping systems and steel structures - A.W.S. Corporation s.r.l.
WWTP in the LOVOCHEMIE, a.s. complex (2016)
Supply and installation of complete technology including piping systems and steel structures - K-PROTOS, a.s.
PVC production after electrolysis shutdown - SPOLANA - Neratovice (2017)
Supply and installation of complete technology including piping systems and steel structures - Mondi SCP, a.s.
Black liquor tank (2017)
Supply and installation of storage tank including accessories - DUSLO, a.s.
New DAM tank (2017)
Complete supply and installation of storage tanks (V = 3000 m3), piping systems and steel structures - KLEMENT, a.s.
Delivery, production and installation of storage tanks - Diamo (2017)
Complete supply and installation of storage tanks, piping systems and steel structures - KLEMENT, a.s.
Pipe installation (2017)
Complete supply and installation of piping systems and steel structures - DUSLO, a.s.
Urea dust filtration from MČ cooling unit (2017)
Supply and installation of complete technology including piping systems and steel structures - DUSLO, a.s.
New DAM tank - 1303 (2017)
Complete supply and installation of storage tanks (V = 3000 m3), piping systems and steel structures - DUSLO, a.s.
Dosing of inhibitors for ENSIN production (2017)
Supply and installation of complete technology including piping systems and steel structures - Mondi SCP, a.s.
Storage tank (White liquor tank and piping) (2017)
Supply and installation of storage tank including accessories - Mondi Štětí, a.s.
Piping bridges (2017)
Supply and installation of complete technology including piping systems and steel structures - Mondi Štětí, a.s.
EcoFlex-BoTH material & erection (2017)
Supply and installation of complete technology including piping systems and steel structures - DUSLO, a.s.
Overhaul of above-ground piping systems (2016)
Dismantling, supply and installation of piping systems and pipe bridges - DUSLO, a.s.
Overhaul of ammonia storage equipment (2016)
Complete supply and installation of TG equipment - DUSLO, a.s.
ČP 4, Power supply and overhaul of above-ground piping (2016)
Supply and installation of complete technology including piping systems and steel structures - A.W.S. Corporation s.r.l.
WWTP in the LOVOCHEMIE, a.s. complex (2016)
Supply and installation of complete technology including piping systems and steel structures
Metallurgy Sector
- U. S. Steel Košice, s.r.o.
Replacement of coal conveyors M51/61, DZ Coke Plant (2023)
Implementation documentation for M51/61 belt conveyor technology, modifications to Transfer Station and Product Silos buildings, electrical installation and upgrade of M51/61 belt conveyor IaRs - U. S. Steel Košice, s.r.o.
ML1 Facility – ML1 storage track repair – Phase I (2022)
Pickling Line (ML1). Dismantling of old beams, demolition of base and cover concrete under beams, removal of old rails and installation of new beams and new trolley track rails. - Třinecké Železárny a.s.
Replacement of VP gas pipe DN 2200 on VP4 between the dust collector and scrubber (2022)
Locksmith work for repairs of steel structures in buildings, conveyor bridges, etc. in Agglomeration plant V2 - Liberty Ostrava, a.s.
Repair of mechanical parts of rotary tippler (2022) - Liberty Ostrava, a.s.
Repair of BZS, steel structures, ČPČS and shaft casing VP No. 2 (2022) - CARMEUSE SLOVAKIA, s.r.o.
SKKO 19016 Shaft furnaces / steel structure / piping / valve installation (2020 – 2022)
Production of steel structure and furnace shaft - Hutní montáže Ostrava, a.s.
Medium repairs of VP6, production, delivery, assembly and disassembly of PS03, PS10 (2021)
General repair of vertical and inclined gas ducts, steel structures and chimney piping. Dismantling and installation of vertical and inclined ducts, chimney, and staircase tower - BKB Metal, a.s.
Nisteje VP6 (2021)
Mechanical works on VP6 - Třinecké Železárny a.s.
– PS02 Skip charging (Investment) PJ02.02 Steel structures (2021)
Dismantling and installation of new skip charging - Třinecké Železárny, a.s.
VP6 Reconstruction – PS01 Belt charging and coke transport (2021)
Complete delivery and installation of piping systems and steel structures - Třinecké Železárny, a.s.
Modernization of water management (2021)
Renewal of obsolete cooling sections and modernization of cooling frames of casting stream LP1–LP3 - Třinecké Železárny, a.s.
Refurbishment of guiding and straightening stand frames at ZPO1 (2021)
Modernization of the 1st, 2nd, and 3rd casting stream including water cooling pipes, hydraulics, and grease lubrication - TKV, s.r.o.
9434BN Vacuum station modernization – U. S. Steel Košice, s.r.o. (2020)
Delivery and installation of steel structures, alloy feed conveyors, installation of shotcrete service carriage, RH vacuum device installation - ALPINET, a.s.
Increasing the capacity of coke oven gas for BF VP2 (U. S. Steel Košice, s.r.o.) (2020)
Construction of coke oven gas connection with accessories for air heater heating - Třinecké Železárny, a.s.
Fan K2 modernization and reconstruction (2020)
Dismantling of existing steel structure and equipment and installation of new technology for converter K2
€629,985 - MORAVIA STEEL, a.s.
Repair of melted ductwork and hood K1 at the boiler part of the KKO gas treatment plant (2019)
General repair of K1 duct and hood - U. S. Steel Košice, s.r.o.
9423 CP, ML1 Modernization – DP 600 (2018)
Complete technology including piping, hydraulics, and steel structures - Termostav Mráz, s.r.o.
9432BL Wind heater no. 24 reconstruction (2019)
Documentation preparation, deliveries, FAT tests, execution of works for TG equipment, piping, steel structures, heating and commissioning - U. S. Steel Košice, s.r.o.
9434 BN, Vacuum station modernization at OC1 (2019)
Assembly of the vacuum station chamber platform, modernization of piping systems and steel access platforms - U. S. Steel Košice, s.r.o.
Gas holder facility (2019)
Replacement of the 4th and 5th rows of gas holder bell sheets - U. S. Steel Košice, s.r.o.
TŠP facility (2019)
Replacement of gearbox P2, couplings, and oil system modifications OS2 - U. S. Steel Košice, s.r.o.
1329 CO, Disc rulers in front of TŠP winders (2019)
Complete delivery and installation of TG equipment for new Eco Slide Disc rulers - U. S. Steel Košice, s.r.o.
ML1 Storage track repair – Phase 1 and 2 (2018)
Replacement of crossbeams and repair of storage track - U. S. Steel Košice, s.r.o.
New vertical stand V3 at TŠP (2018)
Dismantling and installation of new vertical stand V3 - HUTNÍ PROJEKT Frýdek-Místek, a.s.
Project No. 1258BK – Low-emission coke quenching – VKB3 (2018)
Supply and installation of quenching tower – project site U. S. Steel Košice, s.r.o. - U. S. Steel Košice, s.r.o.
9424 BL Stove No.13 Rebuild (2018)
Execution project, complete supply and installation of mechanical part, I&C, automation and commissioning - U. S. Steel Košice, s.r.o.
Preheating of air heater VP No.1 (2018)
Execution project, complete supply and installation of civil, mechanical, I&C, automation and commissioning - U. S. Steel Košice, s.r.o.
9424 BL Reconstruction of Heater No.13 – blast furnace gas pressure increase for BF VP1 (2018)
Delivery and installation of complete technology and piping, including project documentation - U. S. Steel Košice, s.r.o.
9433 BL, Upgrade of coke oven gas distribution for individual heaters (2018)
Design documentation, equipment supply, project implementation and commissioning - U. S. Steel Košice, s.r.o.
Replacement of lower part of chimney and hood K4 (2018)
Dismantling and installation of chimney and hood K4 - Lovochemie, a.s.
Piping repairs on UGL (2018)
Delivery and installation of complete technology including piping systems and steel structures - Lovochemie, a.s.
Reactor off-gas extraction on UGL (2018)
Installation of reactor tank equipment and piping systems - Třinecké Železárny, a.s.
Dust processing silo reconstruction (2017)
Supply and installation of storage tank including accessories - Třinecké Železárny, a.s.
MoRe Block Plant – Auxiliary steel structures SO 06.02, SO 06.03, and SO 06.04 (2017)
Complete delivery and installation of steel structures - Třinecké Železárny, a.s.
Relocation of blocks and slabs behind Block Plant 1 (2017)
Production, delivery, and installation of mechanical part PS 03 for slab handling - Třinecké Železárny, a.s.
MoRe Block Plant – PS 05 Scale removal and PS 07 Roller workshop (2017)
Production, delivery, and installation of comb conveyors and hoppers - U. S. Steel Košice, s.r.o.
Medium repair KK1 and KK3 (2017)
Supply and installation of dedusting technology - Třinecké Železárny, a.s.
MoRe Block Plant – Implementation PS01, PS02, PS06, PS13 (2017)
General repair of rolling stand. Delivery, dismantling, and installation of new rolling stand. - HUTNÍ PROJEKT Frýdek-Místek, a.s.
Emission control for ore bridges VP3 (2017)
Supply and installation of complete technology including piping systems and steel structures - U. S. Steel Košice, s.r.o.
Dismantling of entry section ML No.1 (2017)
Heating device technology - U. S. Steel Košice, s.r.o.
Sinter Belt No. 3 facility (2017)
Supply and installation of complete technology including piping systems and steel structures - Třinecké Železárny, a.s.
Water management reconstruction (2017)
Complete delivery and installation of piping systems and steel structures, commissioning - Třinecké Železárny, a.s.
Roof reconstruction of KKO hall (2016)
Dismantling, delivery and installation of roof steel structures - U. S. Steel Košice, s.r.o.
New powder coal silo – electrical (2016)
Complete supply and installation of electrical part - U. S. Steel Košice, s.r.o.
Chromium-free passivation (2016)
Complete supply and installation of TG equipment, piping and steel structures - HUTNÍ PROJEKT Frýdek-Místek, a.s.
Dedusting of VP2 and VP4 – Arcelor Mittal Ostrava (2015)
Filtration equipment, steel structures, HVAC piping - Třinecké Železárny, a.s.
Primary dedusting (2015)
Dismantling and installation of complete dedusting technology - HUTNÍ PROJEKT Frýdek-Místek, a.s.
VP2 and VP4 – AMO (2015)
Complete dismantling, delivery and installation of piping systems - Třinecké Železárny, a.s.
Gas cleaning plant reconstruction for converter K1, K2 (2015)
Dismantling of existing steel structure and technology and installation of new technology for converter K2 - U. S. Steel Košice, s.r.o.
Flue gas evaporative cooling system KK5 (2015)
Complete delivery and installation of piping systems and steel structures - U. S. Steel Košice, s.r.o.
Powder coal silo (2015)
Complete project delivery, supply and installation of coal storage and supply technology including piping, steel structures, instrumentation - U. S. Steel Košice, s.r.o.
Preheating of combustion air and gas for heater VP3 (2015)
Execution project, complete supply and installation of civil and mechanical parts, instrumentation, automation and commissioning - CARMEUSE SLOVAKIA, s.r.o.
Silo assembly + additional work (2014)
Delivery and installation of storage silo - U. S. Steel Košice, s.r.o.
Galvanizing line No. 3 (2014)
Complete delivery and installation of piping systems including steel structures - HUTNÍ PROJEKT Frýdek-Místek, a.s.
South agglomeration dedusting (2014)
Supply and installation of dedusting technology - EZ-ELEKTROSYSTÉMY Košice s.r.o.
Efficiency improvement of dedusting VP2, VP3 (2014)
Supply and installation of dedusting technology - U. S. Steel Košice, s.r.o.
ML.1 Modernization – Phases 1,2 (Northstar) (2014)
Complete technology including piping, hydraulics, and steel structures - U. S. Steel Košice, s.r.o.
ML.1 Modernization – Initial phase (Northstar) (2014)
Delivery and installation of complete technology including piping systems and steel structures - HUTNÍ PROJEKT Frýdek-Místek, a.s.
Trolleys (2014)
Supply of TG equipment - SIEMENS, s.r.o.
Control station VKB1, VKB3 (2014)
Complete technology including piping and steel structures - U. S. Steel Košice, s.r.o.
Continuous casting modernization ZPO 1 (2009)
Delivery and installation of complete technology including piping systems and steel structures - U. S. Steel Košice, s.r.o.
Blast furnace gas scrubber modernization VP3 DN2000 (2009)
Piping DN 65, DN 250 - U. S. Steel Košice, s.r.o.
Relocation of COG flare tank (2009)
Delivery and installation of complete technology including piping systems and steel structures
Machinery Industry
- Bekaert Hlohovec, a.s.
Dismantling and installation of wire drawing machine (2017)
Electrical works - Třinecké Železárny, a.s.
Piping systems K1 and K2 – gas cleaning (2015)
Complete delivery and installation of piping systems - MINERÁLNE VODY a.s.
Baldovská implementation (2014)
Complete delivery and installation of piping systems - SLOVMAG, a.s. Lubeník
Briquetting line (2013)
Delivery and installation of complete technology including piping systems, steel structures, electrical works and dedusting - CARMEUSE SLOVAKIA, s.r.o.
Construction of spare parts warehouse, Vápenka Košice plant (2013)
Delivery and installation of complete technology including piping systems and steel structures